2020 Landscaping Improvement Project
Posted on May 12, 2021 10:31 PM by Admin
Categories: General
In 2020 the Board in partnership with our property management and landscaping vendors conducted a comprehensive review of all landscaping within the subdivision. Common areas within our subdivision are now more than fifteen years old and the landscaping was showing its age. This natural aging in combination with environmental factors resulted in a deterioration of our subdivisions aesthetic. To remedy this a multi-stage Comprehensive Landscaping Plan was created and implemented to quickly address these mounting issues, improve the appeal of the neighborhood and bring the HOA into a more manageable annual maintenance regimen.
 
The first stage was to focus on the most visually impactful areas and was completed in early 2021. The focus for stage two will be the areas behind the homes and smaller landscaping beds. Stage two is scheduled to begin in Fall or Winter of 2021 to take advantage of off season discounted rates. Below is a list of items included in the Comprehensive Landscaping Plan. Stage two items may be broken up and moved into the 2022 budget year depending on price quotes and available funds. At every stage the Board is careful to maintain a healthy and sustainable annual budget. More items may be added or removed as the need arises. 
 
Stage 1
 
Along Howe Road
  • Replace missing evergreen
  • Remove dead trees
  • Enlarge beds to fit evergreens, properly edge and re-mulch
  • Lower mulch from around tree trunks to prevent rot
  • Remove overgrown and dying bushes and replace with ornamental grasses
  • Anti-fungal treatment for spruce trees to prevent tree loss per Arborist recommendations.
  • Reduce height of bushes causing evergreen limb loss
Trail Between Howe Road and Radiance Drive
  • Remove dead trees and saplings
  • Bush hog undergrowth and weeds
  • Remove trash and debris
  • Trim tree limbs up to ~8 feet
  • Regularly trim to prevent new overgrowth
Prospect Park
  • Remove damaged pillar
  • Remove fallen trees and limbs
  • Cut down dead Ash trees
  • Removed pile of dead branches and stumps near the shelter
Cumberland Pointe Park
  • Removed damaged pillar
  • Reseeded grass in bare areas
Cumberland Pointe Blvd near the ponds
  • Remove infested trees near waterlines
  • Cut down and removal of dead evergreens
  • Replace dead trees with shade trees
  • Reseed grass in bare areas
 
Stage 2 (Scheduled for 2021-2022)
 
Areas behind Clay Bridge, Gallow, Echo and Clear
  • Remove dead and dying trees and shrubs
  • Brush cut overgrown grass and weeds
  • Remove trash and debris
Gallow bordering Prospect Park
  • In addition to the above, bring tree/brush line back approx. 15 ft. from property lines
Cumberland Pointe Blvd near the ponds
  • Add remaining shade trees where evergreens were removed
Prospect Park 
  • Grind stumps and reseed near shelter
  • Add new shrubs and flowers to NE corner bed
North side of property behind ponds
  • Remove and replace evergreens as needed
Behind Harmon
  • Remove and replace evergreens as needed